Game Classification

Critical Path Mechadeus (U.S.A.), Media Vision Technology (U.S.A.), 1993  

Informations Analyses Serious Gaming

ja.games : Critical Path: A flop! 14/11/08

According to MacFun n°1 magazine (Septembre 1995), Critical Path was a flop.The principal reason is maybe the high number of interactive phases which break the gameflow.